However , these two construction structures can be changed via the modern construction conception because the modern spirit is to implement and not to speak special construction conception 通过现代建筑语言这两种建筑都可能发生,因为现代精神是关于执行态度的,而不只是特殊建筑语言。
Relative to the safety design of project structure , the safety identify and the endurance analysis of structure in service etc , the safety analysis of construction structure is still in the level of considerable initial stage 相对于工程结构的安全性设计和在役结构的安全性鉴定、耐久性分析等研究工作,施工结构的安全性分析工作还处于相当初期的水平。
Although does not destroy the original construction structure in the foundation to repair , but in me looked like has been short the very many original historical glorious trace , the white wall appeared too new . ha - ha , this was individual viewpoint 虽然是不破坏原有建筑结构的基础上修复的,但在我个人看来少了很多原来历史悠久的痕迹,白墙显得太新了些呵呵,这只不过是个人观点。
Through the comparison of analysis results in seismic response of construction structures , spring - damper boundary is better than viscous one in improving the computational precise and avoiding the disadvantages of fixed boundary which can not radiate energy 通过建筑结构地震反应分析结果的比较,弹簧?阻尼器边界比粘性边界更好,提高了计算精度,并且克服了固定边界无法辐射能量的缺点。
Article 24 construction projects shall adopt the design options , construction and decoration materials , construction structures , fixtures and equipment resulting in energy and water conservation and other environmentally - friendly and resource - conserving construction planning options 第二十四条建筑工程应当采用节能、节水等有利于环境与资源保护的建筑设计方案、建筑和装修材料、建筑构配件及设备。
This paper on the technique in application in the engineering will make complete analysis , compare construction technique and construction structure technique by technique economy , analyze and appraise construction scheme , explain the problem appearing in engineering , study its engineering application value 对坑式静压桩顶升纠偏技术在工程中的应用作全面的分析,对施工技术、施工组织技术进行技术经济比较,对施工方案进行分析和评价,对工程中出现的问题进行解释,研究其工程推广价值。
With checking and optimization , some rational suggestions on bridge location , shape and overall arrangement is put forward . after construction checking , the author also puts forward some requests for construction pre - cove and safety pier setting , at the same time gives optimum design on joint balance pier . construction structure checking indicated that not only the strength and stability coefficient of rotation stiffness framework is affluent , but also the section size 通过验算及优化,对该桥推荐方案的桥址、武汉理工大学硕士学位论文桥型及桥梁总体布置提出了合理化的建议;通过施工验算,对施工预拱度及保险墩的设置提出了要求,对交界平衡墩进行了优化设计;施工结构验算表明,转体劲性骨架强度、稳定性富余系数较大,截面几何尺寸过大,结构设计过于安全保守,并提出了结构优化的方法,从而大大节省了工程投资,加快了工程进度,增强了桥梁的美观。
Based on the loss rate of historic projects or the indemnity rate of engineering insurance , the engineering insurance rate can be calculated ; with taking into account the instability coefficient in mathematical statistics of relevant data , the fundamental rate will be figured out according to where the projects locates and the vulnerability of the construction structure 对于工程保险费率的确定,采用了以历史工程损失率或工程保险赔付率为基础,并考虑其历史数据的数理统计不稳定系数,按项目所在区域及建筑结构物的易损性作为基本费率,结合具体工程风险大小来调整基本费率。